Interlink Direct, Woodford Green, London

Interlink Direct is a key player in the Chinese dry food importing industry. After in-depth discussions, our architect and engineering teams proposed a solution that utilised and tied in the existing warehouse structures, to create a new extension.

The project included site surveys, building control applications to the local council, detailed architectural design, and finally, construction. Our team delivered a full turnkey solution that extended the steel structure to create additional space. The project followed our process in full, from initial inquiry to the building work going live.

We communicated with Interlink throughout every step of the process, providing them with regular updates on project processes and timelines. The new warehouse space has all additional storage capacity needed to optimise the area and scale up their business operations considerably.

Challenges

Some of the key challenges:

  • Minimal disruption
  • The building occupied the entire site area, limiting space for plant, material storage, and manoeuvrability on site
  • Building control planning application
  • Tie in existing warehouse structures into an integrated solution